The site is 0.5 acres and a new access road had to be put in.

A horizontal reed bed was created to deal with the grey water (shower, sinks and washing machine. The water drains from the house into the holding tank. Hot water enters the tank and cold water exits into the reed bed.

Rather than digging into the sloping site, a platform was created on a grid of 32 telegraph and power poles dug 5 feet into the ground. The photo shows the back row of poles - the north elevation of the house.

Tenons were cut in the top of the poles and two larch beams 12" deep and 3" wide were bolted on to create a ring beam. On top of this a sandwich floor was built using engineered wooden I-beams with OSB sheeting top and bottom. We covered this with black polythene as a temporary weather proofing. Around the perimeter, a larch 'train track' was built with larch spikes onto which the bottom course of bales were placed. The upright timbers are temporary supports for the building corners.

Straw is packed inbetween the 'train track' before the first bales are laid to minimise thermal bridging at the base of the wall.

Larch stakes are pounded down through the various courses of bales.

Wooden boxes or bucks were made for each of the window and door openings. These are pinned into the bales once the roof is on and the bales are fully compressed using larch stakes. The windows and doors just slide into the bucks afterwards.

Keeping the bales dry is imperative and became the bane of everyones lives until the roof was on


A timber ring beam (identical to the train track at the base) is pinned to the wall head again with larch stakes. This distributes the weight of the roof evenly onto the bales.

Green oak trusses and purlins were made off site and craned into place. The inside of the house is open to the underside of the roof which hangs off the purlins - the horizontal oak beams which run the length of the building. They rest on the timber gables and transfer the load down into the bales.

The roof is a sandwich of OSB and engineered I-beams identical to the floor. The gables are the same but much thicker to match the thickness of the bales below them. The deck to the front and east of the house begins to take shape in this photo and the reed bed was planted up I lived on site in a caravan which was hooked up temporarily to the reed bed.

This photo shows the underside of the roof and the inside of the west gable before the inside OSB skin was attached. Warmcell insulation will be blown in the gaps in between the I-beams. You can also see the two horizontal purlins in the roof and the thick timbers in the gable taking the load down onto the top ring beam.

The house faces due south and the bedrooms, bathroom and pantry are all at the rear. Normal stud partitions form the rooms. The front section - kitchen, dining and living areas are all to the front and open plan.

The front section - kitchen, dining and living areas are all to the front and open plan.

The roof was slated using second hand welsh slates. The deck has a shallower pitched roof and was carefully designed so as to prevent direct sunlight coming in through the front windows between March and September. A 2.3kW solar array was fitted. Although not in this picture, solar thermal was also fitted - the brackets are fitted in the photo but not the tubes. Yet.

holes were drilled in the OSB in the floor, gables and ceilings in between each I-beam ready for the insulation to be blown in.

Insulation fills the void in the roof, floor and gables.

This photo shows the top of the compost toilet chamber. The chamber is underneath the house - another reason for building it on piles rather than digging the house into the sloping landscape.

The toilet chambers are the only part of the house build with blocks and cement. It seemed an appropriate place to reuse some of the yellow danger of death signs from the power poles.


The outside of the house was wrapped in chicken wire and three coats of lime render applied. The top coat was pre coloured - no painting required!

The outside of the gables were clad with larch boards. The structre to the right of the back door is my tool shed and houses the electricity meters and inverter for the PV array.

A timber balustrade finishes the front deck. this photo was taken in November and shows the sun shining on the front windows making full use of what solar gain there is in Scotland.

The inside of the straw is plastered with clay. Chicken wire is only used around the windows after the straw was shaped using a chainsaw. The upper part of the gables and the ceiling are plastered in the normal way - these parts don't need to breathe.

Here's the solar thermal being fitted. I am pleased how this has performed despite the weather. It is backed up by a Morso Squirrel stove with a back boiler. The stove is the only source of heating in the house.

Electrics were kept, where possible, in the timber partition walls. The few that are in the straw walls are fed through ducting and the metal boxes screwed to a 2" by 2" wooden spike driven into the bales. The vertical wire to the right of the socket is part of the pre-tensioning system for the bales. Wires were run under the bottom train track and up over the top wall plate and tensioned using fencing gripples. This pulls the top wall plate down and compresses the bales before the roof went on. (bugger - I was trying to do this in order


The kitchen units were made off site from timber salvaged from the High Level Bridge in Newcastle. The same timber was also used for the skirtings, window cills and doors later on.

It took ages for the clay to dry out due to the weather but eventually it did and it was painted with clay paint. The battens on the floor are there to take the oak flooring. This gap was also insulated. The dog pretends to be a fridge.

This is the urine separator for the compost toilet. The straight edge goes to the front. Solids fall through the hole to the rear and the pee goes down the hole at the front. The pee goes to the reed bed. Everyone sits to pee. Even the men.
And here's the end result!



The house is 1,000 sq ft (open plan living room, dining room and kitchen/two beds/walk in wardrobe/office/bathroom/pantry/tool shed) and although I have never had the courage to total it up, I think it cost about £150k to build. I project managed the build but there was a lot of labour involved which really formed the brunt of the cost. There were several weeks where the covering and uncovering the bales before the roof went on was taking 3 hours a day

I have lived in the house for just over a year now and have bought approximately £150 worth of logs for the stove. I will have had £900 back from my PV - mainly Feed In Tariff, although I have exported more leccy than I have consumed. Electric consumption is averaging 1.3kW a day and my bills from Ecotricity are c.£50 a quarter. Half of that cost is fixed charges. Insurance was tricky to find but my premium for building and contents is £300. There's no sewerage charge so Council Tax and water totals £1000 a year.
Was it mentally and emotionally draining? Yes. Do I love it? Yes! Would I do it again? Nooooooooooo! I will go out of this house feet first